Improvement in switching measurements between metric and imperial files with X parallel stock models
• Time saving improvements to Z-level roughing on front faces
• More consistent behaviour of edge selection in 3D Spiral when saving the project
• Time saving improvements to Z-level roughing on front faces
• More consistent behaviour of edge selection in 3D Spiral when saving the project
Comment